MB ELPOWER

Battery and inverter compatibility

The same brand name or a CAN connector alone is not enough.

Checklist

  1. Exact inverter, battery and controller model codes.
  2. Operating voltage limits: LV and HV are not interchangeable.
  3. Permitted module count and wiring configuration.
  4. Manufacturer-approved BMS protocol and communication configuration.
  5. Required inverter and battery firmware versions.
  6. Current manufacturer compatibility list.

Where can I find confirmation?

Use manufacturer documents for the specific series, not just a seller's general description. Catalogue cards link to official information.

GoodWe compatibility document example ↗ · BYD documents ↗

A CAN connector alone does not establish compatibility

The physical connector, pin layout and communication protocol are separate issues. Even if both systems have CAN or RS-485 ports, you still need an approved BMS protocol, correct cable and manufacturer-specified configuration. Check both devices' documentation.

Expansion and firmware versions

For modular systems, check permitted module count, controller generation, operating voltage and manufacturer requirements for combining older and newer modules. The compatibility list must match your model and firmware, not just the brand.

What should I send for a check?

Attach inverter and battery label photos, exact model codes, controller name, module count and known firmware versions. Keep personal login credentials private. Contact us about compatibility or view GoodWe compatibility document.

Choose equipment and prepare an enquiry ↗+370 677 10633